Mezzanines for Phoenix and the ValleyLicensed and insured(928) 232-1752

Phoenix Mezzanine Installation (928) 232-1752 Request a quote

Mezzanines · Rack and shelving decks

Rack-Supported Mezzanines in Phoenix, AZ

Let your pallet rack or shelving carry a walk deck, so pickers work two or three levels of the same aisles. We supply and install rack-supported mezzanines in Phoenix warehouses and parts rooms. The rack and the deck are designed as one structure.

Grating walk deck on top of charcoal pallet racks with yellow beams, with a stair at the aisle end

What Is a Rack-Supported Mezzanine?

It is a raised walk deck whose weight rides on the pallet rack or shelving under it. The same uprights hold your stock and the floor, and pickers work rack faces from each level. Once people work on the deck, it becomes an intermediate level in code terms, so it is a mezzanine. IBC 505.2 and 505.2.1 then bring the 7-foot clearances and the one-third room allowance.

We plan the rack and deck as a single structure within our mezzanine installation in Phoenix.

Rack-Supported or Free-Standing Steel: Which Suits Your Operation?

It comes down to what happens on the deck. If staff pick from rack faces all shift, let the rack carry the walkways, since you need that rack anyway. Does the deck hold pallets, carts or an office, with the floor below kept clear? Then stand it on its own columns as a structural steel mezzanine instead.

Relocating the rack later means relocating the deck as well. See both side by side on the mezzanine options page.

Does an Over-Rack Storage Platform Need a Permit in Phoenix?

Yes. An over-rack storage platform lays decking across the tops of rack runs, or between them, to put the height above the rack to use. Phoenix's version of IBC 105.2 exempts racks, fixtures, cases, counters and partitions no taller than 5 feet 9 inches. Even then, they must be "not an accessible surface." A walk deck over rack is taller than that and people walk on it, so the general permit rule in IBC 105.1 applies.

Even exempt work must still meet the code (105.2). Read when a platform needs no permit in Phoenix and the Phoenix permit and code guide.

How Does a Multi-Tier Shelving System Work?

Steel shelving stacks two or more tiers high, and walk decks between the tiers act as aisles. It is the small-parts form of a rack-supported mezzanine, common in parts rooms, tool cribs and small-item picking. The aisle edges need guards. In Group S areas not open to the public, the building code lets guard openings reach a 21-inch sphere instead of 4 inches.

ADOSH caps guardrail gaps at 19 inches, so we draw to the tighter number. Our guide to the 4-inch, 19-inch and 21-inch rules explains each one, and catwalks and crossovers covers the walkways.

Two tiers of white parts shelving with a steel walk deck between them and a stair at the aisle end
Walk decks between two tiers of parts shelving, with a stair where the aisle ends.

When Does Two-Tier Pallet Racking Count as a Mezzanine?

Once staff stand or walk on decking between the tiers. That decking is an intermediate level within the story, so Section 505 governs it. Its area counts toward the one-third allowance, it needs 7 feet of headroom over and under, and it stays open to the room. Rack loaded only by forklift from the floor, with nobody on an upper deck, stays storage rack. Plan review decides how a given setup is classed.

Under ADOSH, any open side of a walk deck 4 feet or more above the level below needs fall protection. The building code adds guards on open sides more than 30 inches up.

Which Gates Close the Pallet Drop on a Rack-Supported Deck?

A gate that keeps the edge guarded while loads come aboard. ADOSH applies 1910.28(b)(2) at the drop. In a hoist area with a fall of 4 feet or more, each worker gets a guardrail system, personal fall arrest or travel restraint. At a hoist area, chains or a gate may take the place of a lift-out rail only when they match a guardrail's protection.

Anyone leaning through an open gate to guide a load needs personal fall arrest (1910.28(b)(2)(ii)). Every style is on the stairs, railings and gates page, and prices are in the mezzanine cost guide.

Yellow pivot pallet gate bay on a white mezzanine, open to the floor with a pallet inside
A pivot gate bay takes a pallet from the floor while the deck side stays closed.

What Does a Rack-Supported Deck Project Include?

For a deck carried on rack, the job covers confirming the rack can take people and decking, the walkways themselves, stairs up to each tier, edge rails, and gates where pallets come aboard. You order it from us, and our own crew puts it up, from the first measurements to the last inspection. We line up the engineer's sealed drawings and the permit filing with the City of Phoenix. A single order and a single crew, with one person to call.

  • Site visit: floor size, clear height, slab and the way stock moves.
  • Layout tested against IBC 505 and the ADOSH rail and stair rules before any steel is bought.
  • Drawings sealed by an Arizona-registered engineer, and the permit filing.
  • Delivery of the columns, beams, deck, stairs, guardrail, gates and any lift.
  • Our crew installs it, then the inspections and the posted load signs.

Sources, read November 2026: Phoenix Building Code 2024, Chapter 1, via UpCodes · Phoenix Building Code 2024, Chapter 2 definitions, via UpCodes · Phoenix Building Code 2024, Section 505, via UpCodes · Phoenix Building Code 2024, Chapter 10 means of egress, via UpCodes · City of Phoenix, Commercial Building Permit Submittal Checklist (Rev. 06/25) · City of Phoenix, SHAPE PHX · Ariz. Admin. Code R20-5-602, via Cornell LII · OSHA 29 CFR 1910.21 · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29

01Questions

Rack-Supported Deck Questions, Answered

Does a rack-supported mezzanine in Phoenix need a building permit?

Yes. A deck people walk on falls under IBC 105.1. The Phoenix rack exemption only reaches racks 5 feet 9 inches or shorter that are not an accessible surface. Commercial permits are filed through SHAPE PHX, with drawings sealed by an Arizona-registered engineer.

Source: IBC 105.1, 105.2 (Phoenix text); City of Phoenix submittal checklist

Can a walk deck go on pallet rack I already own in Phoenix?

Sometimes. The rack has to be designed for people and decking on top of the pallets. An engineer checks what each upright can hold with everything combined. If the numbers fall short, new rack or a free-standing deck is the answer.

Does a rack-supported deck count toward the one-third rule in Phoenix?

Yes. IBC 505.2.1 limits the combined area of every mezzanine in a room to one-third of that room. A walk deck between rack tiers is a mezzanine, so it shares the allowance with any other deck there.

Source: IBC 505.2.1

Do rack-supported mezzanines in Phoenix need guardrails?

Yes. Guards are required by the building code wherever an open side stands more than 30 inches over the floor below. ADOSH's trigger is an edge 4 feet up, with a top rail at 42 inches, give or take 3. Pallet openings get gates or equal protection.

Source: IBC 1015.2; 29 CFR 1910.28(b)(1), (b)(2); 1910.29(b)

02Request for quote

Build Your Quote

Give us the room, the height and the load you have in mind. A Valley installer answers with questions or a written price.

  1. 1You send the floor size, the clear height and the use.
  2. 2We test the plan against IBC 505 and the ADOSH rules.
  3. 3You receive a written quote that lists each step.

Prefer to talk? (928) 232-1752

Free-standing white steel mezzanine with yellow guardrail on four sides and one stair, seen from above

Build Up Inside Your Phoenix Building

  • Rated for what you store.
  • Drawn to the 2024 Phoenix code.
  • Installed around your schedule.
CallRequest a quote