Options · Pick each part of your deck
Mezzanine Options for Phoenix Warehouses and Plants
Choose the type, the framing, the deck surface, the stairs, the gates and any lift. You buy every piece from us and our crew sets it up, all within one job of mezzanine installation in Phoenix.

02Types
Which Mezzanine Type Suits the Work in Your Building?
Start from the job the deck will do. Free-standing steel leaves the floor under it open, rack and shelving decks stand on the storage uprights, and bolt-together kits suit smaller rooms. Pick modules stack picking on several levels, while platforms and catwalks reach machines and air units. In most cases a deck people work on counts as a mezzanine under IBC Section 505, which Phoenix adopted without changes in its 2024 code: 7 feet of clear height above and below, and no larger than a third of the room's floor area. The 2024 text leaves enclosed rooms and the mezzanine itself out when that room is measured. A platform that carries only equipment follows Section 505.3 instead.
-

Structural steel mezzanine
Its own columns carry the deck, so the floor below stays free for work. See structural steel mezzanines.
-

Rack-supported mezzanine
Pallet rack uprights hold the walk deck, so storage and floor share one frame. See rack-supported mezzanines.
-

Shelving-supported mezzanine
A second level of parts shelving, reached by walk aisles laid between the bays.
-

Modular mezzanine
Standard bolted parts that can grow or move with you later. See modular mezzanines.
-

Pick module
Order picking on two or more levels, often fed by conveyor. See pick modules.
-

Work or equipment platform
Holds machines or process vessels and gives crews service access. See work platforms.
-

Catwalk or crossover bridge
A narrow walkway to units high on a wall, or a bridge over a line. See catwalks and crossovers.
-

Elevated office or control room
A windowed room above the floor it watches. See control rooms and raised offices.
03Framing
How Does the Framing Set Column Spacing and Load?
The framing decides how far apart your columns can stand and how much the deck can carry, so we choose it from your column grid, your load and what runs overhead. Phoenix's commercial checklist asks for structural drawings sealed by a structural or civil engineer registered in Arizona, with calculations that cover vertical and lateral loads, so that engineer fixes the final spans. Shop-built steel is either made by a City-approved fabricator or inspected while it is fabricated (IBC 1704.2.5). Your Phoenix permit and code guide walks through the filing.
| Frame style | Column spacing | Where it fits |
|---|---|---|
| Light bolted frame | Closer columns, shorter bays | Small storage decks and kits you may move later |
| Rolled beam and girder frame | Wider bays with a shallow floor depth | Fewer columns where forklifts turn |
| Open-web joist or truss frame | The widest clear spans | Room inside the floor depth for lights, pipe and ducts |
| Moment (rigid) frame | Set by the engineer | Aisles that cannot take diagonal bracing |
04Deck surface
Which Deck Surface Fits the Traffic on Your Mezzanine?
The surface depends on the traffic: feet and cartons, carts and pallet jacks, or hard wheels and dropped parts. Board laid on corrugated steel deck suits carton storage, composite panels give carts a smooth face, open bar grating lets light and air through, plate takes hard wear, and concrete makes the heaviest and quietest floor. The surface does not set the rating, though. Table 1607.1 sets the live load by use, such as 125 psf for light storage and 50 psf for offices, and the engineer designs for the largest load the use will bring, never less than the table (IBC 1607.3). Our mezzanine decking page compares each one.
-

Wood board over steel deck
Panels fixed over corrugated steel deck; a common pick for carton storage.
-

Resin board or composite panels
An even, smooth face for pallet jacks, carts and totes.
-

Steel bar grating
Open bars let daylight and air reach the floor below.
-

Steel floor plate
Raised-pattern plate for steel carts and rough daily wear.
-

Concrete on form deck
A poured slab on steel form deck: solid and quiet underfoot.
05Stairs and ladders
Which Stair or Ladder Should Reach Your Deck?
Use a full stair wherever people climb every day, and keep ladders and steep stairs for service trips. Two rule sets apply in Phoenix. The 2024 IBC asks for risers of 7 inches or less, treads of at least 11 inches and a 44-inch width, or 36 inches where fewer than 50 people use the stair (IBC 1011). ADOSH enforces 29 CFR 1910.25, which wants standard stairs pitched no flatter than 30 and no steeper than 50 degrees, with landings no narrower than the stair and no shallower than 30 inches. Where the numbers differ, our drawings satisfy both. Details are on stairs, railings and gates.
-

Standard stairs
For daily climbs with hands full; set between 30 and 50 degrees.
-

Steep-access stairs
Ships ladders and alternating tread devices for reaching equipment platforms.
-

Stair landings
For turns and long climbs; as wide as the stair or wider, and 30 inches deep or more.
-

Fixed ladders
Service access only; a gate that swings shut on its own guards the opening up top.
06Gates
Which Pallet and Access Gates Does Your Deck Edge Need?
Each pallet drop and each stair or ladder opening in the rail needs protection, and a gate is the usual answer. OSHA's 1910.21(b), which ADOSH enforces, calls an edge opening where materials are loaded or received a hoist area, and workers there need protection wherever the drop is 4 feet or greater (1910.28(b)(2)). In place of a lift-out rail section, a hoist area may use gates or chains that give equal protection (1910.29(b)(10)). A ladder access hole needs an offset or a self-closing gate (1910.29(b)(13)). A two-gate bay keeps one side shut while a pallet is set down; swing and sliding gates are simpler.
-

Pivot pallet gate
The gate turns between the bay's two sides, so one side is always closed.
-

Two-gate lift-up bay
The outer gate rises for the forklift while the inner one guards the deck.
-

Self-closing swing gate
Swings shut on its own at a stair top or ladder opening.
-

-

-

Gate beacon and alarm
A light and a sounder that warn when a gate is left open.
07Lifts
When Should a Mezzanine in Phoenix Get a Material Lift?
A lift earns its place in two cases: forklifts have no way to the deck edge, or carts and totes go up and down all shift. A vertical reciprocating conveyor (VRC) moves pallets and carts; a rideable material lift takes a worker up with the load. If a forklift can set loads on the edge, a gated pallet drop may be all you need. The opening where any lift loads the deck fits OSHA's hoist-area definition in 1910.21(b), so it gets a gate or rail like a pallet drop. The unit itself is chosen with you and shown on the drawings filed for plan review. More on mezzanine lifts.
-

Vertical reciprocating conveyor (VRC)
Lifts pallets, carts and totes from floor level up to the deck.
-

Rideable material lift
Carries a worker together with the cart or load to the upper level.
08Add-ons
Which Add-Ons Do Phoenix Buyers Ask For Most?
Offices on the deck, lights and fire protection underneath, conveyor supports, load signs and column guards come up most. An office changes the rules: a mezzanine must stay open to the room, apart from columns, posts and walls no taller than 42 inches, unless an exception fits, such as enclosed space for 10 people or fewer, or two or more exits (IBC 505.2.3). In Phoenix, sprinkler and alarm changes need their own fire permit (IBC 105.1 as amended). Any floor designed above 50 psf needs durable signs showing its load, and Phoenix grants the certificate of occupancy only after they are posted (IBC 106.1, 106.2). Each add-on is priced in your quote; the cost guide shows what moves the total.
-

Modular office on the deck
A glazed office on a deck rated for it; offices start at 50 psf.
-

Lighting and fire protection below
Fixtures and sprinkler changes under the deck, on their own fire permit.
-

Conveyor supports
Steel that carries conveyor runs along the deck and down to the floor.
-

-

Column and rack protectors
Steel guards where forklifts pass close to columns and uprights.
Sources, read November 2026: City of Phoenix, Building Code (2024 PBCC) · City of Phoenix, 2024 IBC amendment sheets · Phoenix Building Code 2024, Chapter 1, via UpCodes · Phoenix Building Code 2024, Section 505, via UpCodes · Phoenix Building Code 2024, Chapter 10 means of egress, via UpCodes · Phoenix Building Code 2024, Table 1607.1, via UpCodes · Phoenix Building Code 2024, Chapter 17 special inspections, via UpCodes · City of Phoenix, Commercial Building Permit Submittal Checklist (Rev. 06/25) · City of Phoenix, Approved fabricator resources · OSHA, Arizona State Plan · Ariz. Admin. Code R20-5-602, via Cornell LII · OSHA 29 CFR 1910.21 · OSHA 29 CFR 1910.25 · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29
09Questions
Mezzanine Options Questions, Answered
Do you sell the mezzanine as well as install it in Phoenix?
Yes, both. Everything on this page is ordered through us, from the columns to the last gate, and our own crew puts it up. We also arrange drawings sealed by an Arizona-registered engineer and the City of Phoenix permit filing, so a single order covers the job.
Source: Phoenix Commercial Building Permit Submittal Checklist
How long is the lead time on mezzanine options in Phoenix?
It changes with the design, the parts and the city's plan review, so we give it per job. Press "Check lead time" on any card and we answer with today's lead time for that option; your written quote then lists each step. Phoenix collects plan review fees at submittal and permit fees when the permit is issued.
Source: Phoenix Commercial Building Permit Submittal Checklist
Which option choices change the mezzanine permit in Phoenix?
Offices and enclosed rooms, sprinkler or alarm changes, and anything that adds load. Enclosed space falls under the openness rule in IBC 505.2.3, Phoenix issues a separate permit for fire sprinkler and alarm work (IBC 105.1 as amended), and decks over 50 psf need posted load signs (IBC 106.1). We settle the options before anything is filed.
Source: IBC 505.2.3, 105.1, 106.1 (2024 PBCC)
Can I add a gate or a lift to an existing mezzanine in Phoenix?
Usually, yes. Changing a structure counts as an alteration, and Phoenix asks for a permit before one starts (IBC 105.1), so we first check the deck's design load and edge framing. A gate at a pallet drop protects a hoist area under 29 CFR 1910.28(b)(2); a lift adds its own opening that gets the same treatment.
Source: IBC 105.1; 29 CFR 1910.21(b), 1910.28(b)(2)
10Request for quote
Request a Quote or a Lead Time
Give us the room, the height and the load you have in mind. A Valley installer answers with questions or a written price.
- 1You send the floor size, the clear height and the use.
- 2We test the plan against IBC 505 and the ADOSH rules.
- 3You receive a written quote that lists each step.
Prefer to talk? (928) 232-1752
Keep Planning Your Mezzanine
Every mezzanine service we installEvery mezzanine, platform and office service on one page.Read more
Mezzanine cost per square footPlanning ranges per square foot, and when Phoenix fees fall due.Read more
Mezzanine deck surfacesFive deck surfaces, matched to your loads and wheels.Read more
Stairs, rails and pallet gatesStairs, rails and pallet gates drawn to the IBC and ADOSH.Read more
Permits and code in PhoenixThe 2024 Phoenix code, SHAPE PHX filing and the ADOSH rules.Read more
Mezzanine installation in PhoenixMezzanine installation for Phoenix warehouses, plants and shops.Read more

Build Up Inside Your Phoenix Building
- Rated for what you store.
- Drawn to the 2024 Phoenix code.
- Installed around your schedule.