Mezzanines for Phoenix and the ValleyLicensed and insured(928) 232-1752

Phoenix Mezzanine Installation (928) 232-1752 Request a quote

Move, expand, remove · Permitted work

Mezzanine Removal, Relocation and Expansion in Phoenix

We take down, move and enlarge mezzanines in Phoenix buildings. A bolted deck can stand again in a new building, gain extra bays where it is, or come out to clear the floor. Each of those jobs needs a city permit first.

White mezzanine half taken down, with beams and deck panels stacked and banded on the floor

Can a Mezzanine Be Moved to Another Phoenix Building?

Yes, when the frame is bolted. A bolted mezzanine comes apart into columns, beams, joists, deck, stairs and rail, and those parts can stand again elsewhere; bolt-together modular mezzanines come apart most easily. The new room sets fresh limits. Under the 2024 IBC the deck may cover one-third of that room, measured without its enclosed parts and without the mezzanine itself, and it needs 7 feet clear above and below. The new slab has to carry the column loads. An Arizona-registered engineer reviews each reused part for the new layout, and our crew handles the move as part of our mezzanine installation in Phoenix.

New charcoal steel beams and deck panels staged inside an open dock door, desert daylight outside
Beams and deck panels staged inside a dock door, ready for the frame to go up.

Do You Need a Permit to Move, Enlarge or Remove a Mezzanine?

Yes. IBC 105.1, as Phoenix enforces it, tells an owner or agent who intends to "construct, enlarge, alter, repair, move, demolish" a structure to apply for and obtain the permit first. A move needs a permit at the receiving building, and taking a deck out counts as demolition. New commercial permits in Phoenix are filed through the City's SHAPE PHX portal. The City's submittal checklist asks remodels and alterations for a structural evaluation with calculations. Sprinkler or alarm changes under the old or new deck take their own fire permit. The steps are on our Phoenix permits and code page.

How Is an Existing Mezzanine Expanded?

By adding bays to the frame after two checks: the code limit and the old steel. Under IBC 505.2.1, all the mezzanines in a room share a single cap, a third of the room's floor area. A room with a mezzanine and an equipment platform may hold two-thirds in total, with the mezzanine share still capped (505.2.1.1). New bays match or exceed the existing load rating. Stairs and exits get a fresh check for the larger deck. City permit records show the demand: a 2025 Mesa permit reads "Expand existing mezzanine area 1,540 SF to create storage area at existing warehouse with offices."

The floor-space estimator on our home page shows what area the room has left.

Charcoal mezzanine frame part-way up, joists stacked on the floor and two scissor lifts beside it
A steel frame part-way up, joists stacked on the floor and scissor lifts beside it.

Can a Mezzanine Be Changed Without Moving It?

Yes. A column can be shifted, bays reworked, or a deck rebuilt as a full floor, each as permitted alteration work. Tempe's permit records include a 2023 permit to relocate a mezzanine support column in a manufacturing area and a 2021 permit to convert an existing mezzanine to a second floor. A change like that can alter how the level is classed. If the converted level falls outside IBC Section 505, the code no longer treats it as a mezzanine, and it can count as another story, so plan review decides. Read more on adding a second floor to a warehouse.

What Happens When a Mezzanine Is Removed?

The deck comes down in reverse order: gates and rail, deck, joists, beams, then columns, with each part sorted, stacked and banded on the floor. Removal is demolition under IBC 105.1, so the permit comes first. Lights, sprinkler pipe and alarm devices under the deck are handled before the steel moves, and in Phoenix any sprinkler or alarm change takes its own fire permit. If the parts will be reused, we tag them by gridline as they come down. The slab is left clear for your new layout. Size and access drive the effort, as our mezzanine cost guide explains.

Is a Used Mezzanine Worth Buying?

It can be, when it fits your room, your loads and the rules in force now. Ask the seller for the original drawings and the load rating. The deck has to suit your use under IBC Table 1607.1, clear 7 feet above and below, and stay inside the one-third limit for your room. Rails and stairs have to meet the ADOSH rules: top rails at 42 inches, plus or minus 3, openings no wider than 19 inches, and stair rails installed since January 17, 2017 at least 42 inches tall. Older rails and gates may need replacing.

Attach the seller's drawings and a few photos when you request a quote, and we review the deck before you buy. Parts and add-ons are in our mezzanine options gallery.

What Does a Move, Expansion or Removal Project Include?

A move, expansion or removal job covers a survey of the standing steel, an engineering review of each reused or added part for the new layout, the take-down or rebuild, and fresh load signs wherever the design load changes. You order it from us, and our own crew puts it up, from the first measurements to the last inspection. We line up the engineer's sealed drawings and the permit filing with the City of Phoenix. A single order and a single crew, with one person to call.

  • Site visit: floor size, clear height, slab and the way stock moves.
  • Layout tested against IBC 505 and the ADOSH rail and stair rules before any steel is bought.
  • Drawings sealed by an Arizona-registered engineer, and the permit filing.
  • Delivery of the columns, beams, deck, stairs, guardrail, gates and any lift.
  • Our crew installs it, then the inspections and the posted load signs.

Sources, read November 2026: Phoenix Building Code 2024, Chapter 1, via UpCodes · Phoenix Building Code 2024, Chapter 2 definitions, via UpCodes · Phoenix Building Code 2024, Section 505, via UpCodes · Phoenix Building Code 2024, Table 1607.1, via UpCodes · City of Phoenix, SHAPE PHX · City of Phoenix, Commercial Building Permit Submittal Checklist (Rev. 06/25) · City of Mesa open data, Building Permits (retired set) · City of Tempe, Permits Issued by Building Safety · OSHA 29 CFR 1910.29

01Questions

Move, Expansion or Removal Questions, Answered

Do I need a permit to remove a mezzanine in Phoenix?

Yes. IBC 105.1 requires a permit before a structure is demolished, and Phoenix takes new commercial applications through SHAPE PHX. If sprinklers or alarms under the deck change, that work needs its own fire permit.

Source: IBC 105.1 as amended by Phoenix; City of Phoenix SHAPE PHX

Can our mezzanine go up again in another building in the Phoenix area?

Yes, as long as the frame is bolted and the receiving room passes the checks. The one-third limit is measured again in that room, the slab and the 7-foot clearances are checked, and the permit is filed with the city where that building stands.

Source: IBC 105.1, 505.2, 505.2.1

Can you add bays to our existing mezzanine in Phoenix?

Usually. We first measure what the room still allows, since every mezzanine in it shares one area cap of one-third. Then an engineer checks the existing frame, and the stairs and exits are sized for the bigger deck.

Source: IBC 505.2.1

Do load signs change when a mezzanine in Phoenix is moved or expanded?

They follow the deck's design load. In a commercial or industrial building, any floor with a design live load above 50 psf carries durable signs, and the certificate of occupancy waits for them. A moved or enlarged deck gets signs showing its new rating.

Source: IBC 106.1, 106.2

02Request for quote

Build Your Quote

Give us the room, the height and the load you have in mind. A Valley installer answers with questions or a written price.

  1. 1You send the floor size, the clear height and the use.
  2. 2We test the plan against IBC 505 and the ADOSH rules.
  3. 3You receive a written quote that lists each step.

Prefer to talk? (928) 232-1752

Free-standing white steel mezzanine with yellow guardrail on four sides and one stair, seen from above

Build Up Inside Your Phoenix Building

  • Rated for what you store.
  • Drawn to the 2024 Phoenix code.
  • Installed around your schedule.
CallRequest a quote