Code guide · 2024 PBCC

Phoenix's 2024 Building Code and Your Mezzanine: What Changed on August 1, 2025

Phoenix plan review now reads every new mezzanine against the 2024 Phoenix Building Construction Code. The City adopted it on June 18, 2025, and it took effect on August 1, 2025. The mezzanine rules in IBC Section 505 came through with no Phoenix amendment, so the 2024 model text is the text that applies.

Free-standing white steel mezzanine with yellow guardrail on four sides and one stair, seen from above

Which Building Code Does Phoenix Enforce for Mezzanines?

Phoenix enforces the 2024 Phoenix Building Construction Code, or PBCC. The City Council adopted it on June 18, 2025, and it took effect on August 1, 2025, under Ordinance G-7397. The PBCC adopts the 2024 International Building Code with Phoenix amendments, plus the related residential, mechanical, plumbing, energy and electrical codes.

The building code part carries a local name: the "International Building Code as Amended by the City of Phoenix." Our Phoenix permit and code guide shows where it fits in the filing. As Phoenix mezzanine installers, we lay out each deck against this text before any steel is ordered.

What Changed for Mezzanine Projects on August 1, 2025?

The code edition changed. Plans submitted for an initial review from August 1, 2025 had to meet the 2024 PBCC, apart from exceptions the City listed in its implementation notice. Every plan submitted after December 31, 2025 must meet it. So a mezzanine filed in Phoenix today is reviewed under the 2024 text.

Standard plans approved under the 2018 Phoenix code had a longer runway. They stayed in effect until July 31, 2026, and that date has now passed.

Dates That Moved Phoenix to the 2024 CodeCity of Phoenix, 2024 PBCC implementation notice.
DateWhat it marks
June 18, 2025City Council adopts the 2024 PBCC
August 1, 2025The 2024 PBCC takes effect for plans entering initial review
After December 31, 2025Every submitted plan must comply with the 2024 PBCC
July 31, 2026Last day for standard plans approved under the 2018 code

An older drawing set made to the 2018 code needs a check against the 2024 text before it goes in.

Did Phoenix Amend the Mezzanine Rules in Section 505?

No. Phoenix's 2024 IBC amendment sheets list every section the City changed, and Section 505 is not on the list. Neither are the egress, stair, handrail and guard sections a mezzanine leans on most: 1004, 1011, 1014 and 1015. The guard and handrail load rule in 1607.9 is untouched as well. For those sections, the 2024 model text is the Phoenix text.

Phoenix did amend two nearby rules. It retitled 1104.4, the accessible-route rule, from multistory to multilevel buildings. Its change to Table 1607.1 touches only the one- and two-family dwelling row, so no commercial or industrial live load moved. Our guide to accessible routes under IBC 1104.4 covers the first change.

How Much Mezzanine Does the 2024 Code Allow in One Room?

One-third of the room's floor area, as a base rule. Section 505.2.1 caps the "aggregate area of a mezzanine or mezzanines within a room" at one-third of that room. The 2024 text then says how to measure the room: "The enclosed portion of a room shall not be included in a determination of the floor area of the room in which the mezzanine is located." The mezzanine's own area is left out of the room too.

Here is how that plays out. A 30,000 sq ft room with 3,000 sq ft walled off as an enclosed office counts as 27,000 sq ft, so its mezzanines may total 9,000 sq ft. Plan review confirms how your room is measured.

Area Caps in Section 505 of the 2024 Code2024 IBC 505.2.1 and 505.2.1.1, as adopted in Phoenix.
ConditionCapWhere it comes from
Any room, base ruleOne-third of the room505.2.1
Type I or II construction, sprinklered throughout under 903.3.1.1, with an approved emergency voice/alarm communication systemOne-half of the room505.2.1 exception
Type I or II construction housing a special industrial occupancyTwo-thirds of the room505.2.1 exception
A mezzanine and an equipment platform sharing one roomTwo-thirds for the pair505.2.1.1
White steel mezzanine running the length of a long hall, with two stairs and stripes of sunlight on the floor
A long deck can still sit inside the one-third cap when the room around it is large enough.

What Clear Height and Openness Does Section 505 Require?

At least 7 feet of clear height above the deck and 7 feet below it, measured from the mezzanine floor construction under Section 505.2. The deck must also stay "open and unobstructed to the room" apart from walls no taller than 42 inches, columns and posts.

Section 505.2.3 lists ways around the openness rule. An enclosed room may serve 10 occupants at most, or the deck may have two or more exits. Walls may also close off up to a tenth of the deck area. Mezzanines for control equipment in industrial plants may be glazed on all sides. A raised office often relies on one of them, so we settle which one with you before the drawings are sealed.

When Does a Raised Level Count as Another Story?

When it falls outside Section 505. Chapter 2 defines a mezzanine as "An intermediate level or levels between the floor and ceiling of any story and in accordance with Section 505." A level that meets 505.2 is "considered a portion of the story below," so it adds nothing to building area or the story count. A level outside those limits is not a mezzanine under the code, and it can then be counted as another story.

Plan review decides how each level is classed. That is why height, area and openness get tested on the layout first. What shifts when a level is treated as a story is covered on our second floor for a warehouse page.

Two-level charcoal mezzanine with shelving on both decks and a stair up to each level
A stepped deck with two raised levels; plan review decides how each one is classed.

Which Code Applies Outside Phoenix City Limits?

That depends on who issues the permit. In unincorporated Maricopa County, the Board of Supervisors adopted the 2024 I-Codes on 21 October 2026, effective 20 November 2026. The 2018 I-Codes stay in effect through 20 May 2027 for some projects, such as plans submitted before 20 November 2026 and projects already in review.

Each Valley city, such as Mesa, Tempe or Chandler, runs its own permit office. We confirm the edition with that city before a drawing is sealed and never assume it matches Phoenix.

Phoenix 2024 Code Questions, Answered

When did Phoenix switch to the 2024 building code?

On August 1, 2025. The City Council adopted the 2024 Phoenix Building Construction Code on June 18, 2025, and every plan submitted after December 31, 2025 must comply with it. New mezzanine filings in Phoenix are reviewed under the 2024 text.

Source: City of Phoenix, 2024 PBCC implementation notice

Did Phoenix change the IBC mezzanine section?

No. Section 505 does not appear on Phoenix's 2024 IBC amendment sheets. The one-third area cap, the 7-foot clear height rule and the openness rule read the same as in the 2024 International Building Code.

Source: City of Phoenix, 2024 IBC amendment sheets

Is a mezzanine counted as a story in Phoenix?

Not if the level stays within Section 505. The code then treats it as part of the story below, so the building gains no story and no area, while the fire area still includes it. A level outside those limits can be classed as a story at plan review.

Source: IBC 505.2 and Chapter 2 definitions

Which building code applies in unincorporated Maricopa County near Phoenix?

The 2024 I-Codes, effective 20 November 2026, under the county's adoption of 21 October 2026. Some projects already in the pipeline may stay on the 2018 I-Codes through 20 May 2027.

Source: Maricopa County, 2024 Building Code Implementation

Sources, read November 2026: City of Phoenix, Building Code (2024 PBCC) · City of Phoenix, 2024 PBCC implementation notice · City of Phoenix, 2024 IBC amendment sheets · City of Phoenix, 2024 IBC Chapter 1 amendments · Phoenix Building Code 2024, Section 505, via UpCodes · Phoenix Building Code 2024, Chapter 2 definitions, via UpCodes · Maricopa County, 2024 Building Code Implementation