Mezzanines for Phoenix and the ValleyLicensed and insured(928) 232-1752

Phoenix Mezzanine Installation (928) 232-1752 Request a quote

Options · Pick each part of your deck

Mezzanine Options for Phoenix Warehouses and Plants

Choose the type, the framing, the deck surface, the stairs, the gates and any lift. You buy every piece from us and our crew sets it up, all within one job of mezzanine installation in Phoenix.

Three steel mezzanine designs in one hall: storage deck, deck with a glazed office and a work platform

02Types

Which Mezzanine Type Suits the Work in Your Building?

Start from the job the deck will do. Free-standing steel leaves the floor under it open, rack and shelving decks stand on the storage uprights, and bolt-together kits suit smaller rooms. Pick modules stack picking on several levels, while platforms and catwalks reach machines and air units. In most cases a deck people work on counts as a mezzanine under IBC Section 505, which Phoenix adopted without changes in its 2024 code: 7 feet of clear height above and below, and no larger than a third of the room's floor area. The 2024 text leaves enclosed rooms and the mezzanine itself out when that room is measured. A platform that carries only equipment follows Section 505.3 instead.

03Framing

How Does the Framing Set Column Spacing and Load?

The framing decides how far apart your columns can stand and how much the deck can carry, so we choose it from your column grid, your load and what runs overhead. Phoenix's commercial checklist asks for structural drawings sealed by a structural or civil engineer registered in Arizona, with calculations that cover vertical and lateral loads, so that engineer fixes the final spans. Shop-built steel is either made by a City-approved fabricator or inspected while it is fabricated (IBC 1704.2.5). Your Phoenix permit and code guide walks through the filing.

Mezzanine Framing Styles ComparedPlanning guide only. The Arizona-registered engineer of record sets every span, member size and brace.
Frame styleColumn spacingWhere it fits
Light bolted frameCloser columns, shorter baysSmall storage decks and kits you may move later
Rolled beam and girder frameWider bays with a shallow floor depthFewer columns where forklifts turn
Open-web joist or truss frameThe widest clear spansRoom inside the floor depth for lights, pipe and ducts
Moment (rigid) frameSet by the engineerAisles that cannot take diagonal bracing

04Deck surface

Which Deck Surface Fits the Traffic on Your Mezzanine?

The surface depends on the traffic: feet and cartons, carts and pallet jacks, or hard wheels and dropped parts. Board laid on corrugated steel deck suits carton storage, composite panels give carts a smooth face, open bar grating lets light and air through, plate takes hard wear, and concrete makes the heaviest and quietest floor. The surface does not set the rating, though. Table 1607.1 sets the live load by use, such as 125 psf for light storage and 50 psf for offices, and the engineer designs for the largest load the use will bring, never less than the table (IBC 1607.3). Our mezzanine decking page compares each one.

05Stairs and ladders

Which Stair or Ladder Should Reach Your Deck?

Use a full stair wherever people climb every day, and keep ladders and steep stairs for service trips. Two rule sets apply in Phoenix. The 2024 IBC asks for risers of 7 inches or less, treads of at least 11 inches and a 44-inch width, or 36 inches where fewer than 50 people use the stair (IBC 1011). ADOSH enforces 29 CFR 1910.25, which wants standard stairs pitched no flatter than 30 and no steeper than 50 degrees, with landings no narrower than the stair and no shallower than 30 inches. Where the numbers differ, our drawings satisfy both. Details are on stairs, railings and gates.

06Gates

Which Pallet and Access Gates Does Your Deck Edge Need?

Each pallet drop and each stair or ladder opening in the rail needs protection, and a gate is the usual answer. OSHA's 1910.21(b), which ADOSH enforces, calls an edge opening where materials are loaded or received a hoist area, and workers there need protection wherever the drop is 4 feet or greater (1910.28(b)(2)). In place of a lift-out rail section, a hoist area may use gates or chains that give equal protection (1910.29(b)(10)). A ladder access hole needs an offset or a self-closing gate (1910.29(b)(13)). A two-gate bay keeps one side shut while a pallet is set down; swing and sliding gates are simpler.

07Lifts

When Should a Mezzanine in Phoenix Get a Material Lift?

A lift earns its place in two cases: forklifts have no way to the deck edge, or carts and totes go up and down all shift. A vertical reciprocating conveyor (VRC) moves pallets and carts; a rideable material lift takes a worker up with the load. If a forklift can set loads on the edge, a gated pallet drop may be all you need. The opening where any lift loads the deck fits OSHA's hoist-area definition in 1910.21(b), so it gets a gate or rail like a pallet drop. The unit itself is chosen with you and shown on the drawings filed for plan review. More on mezzanine lifts.

08Add-ons

Which Add-Ons Do Phoenix Buyers Ask For Most?

Offices on the deck, lights and fire protection underneath, conveyor supports, load signs and column guards come up most. An office changes the rules: a mezzanine must stay open to the room, apart from columns, posts and walls no taller than 42 inches, unless an exception fits, such as enclosed space for 10 people or fewer, or two or more exits (IBC 505.2.3). In Phoenix, sprinkler and alarm changes need their own fire permit (IBC 105.1 as amended). Any floor designed above 50 psf needs durable signs showing its load, and Phoenix grants the certificate of occupancy only after they are posted (IBC 106.1, 106.2). Each add-on is priced in your quote; the cost guide shows what moves the total.

Sources, read November 2026: City of Phoenix, Building Code (2024 PBCC) · City of Phoenix, 2024 IBC amendment sheets · Phoenix Building Code 2024, Chapter 1, via UpCodes · Phoenix Building Code 2024, Section 505, via UpCodes · Phoenix Building Code 2024, Chapter 10 means of egress, via UpCodes · Phoenix Building Code 2024, Table 1607.1, via UpCodes · Phoenix Building Code 2024, Chapter 17 special inspections, via UpCodes · City of Phoenix, Commercial Building Permit Submittal Checklist (Rev. 06/25) · City of Phoenix, Approved fabricator resources · OSHA, Arizona State Plan · Ariz. Admin. Code R20-5-602, via Cornell LII · OSHA 29 CFR 1910.21 · OSHA 29 CFR 1910.25 · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29

09Questions

Mezzanine Options Questions, Answered

Do you sell the mezzanine as well as install it in Phoenix?

Yes, both. Everything on this page is ordered through us, from the columns to the last gate, and our own crew puts it up. We also arrange drawings sealed by an Arizona-registered engineer and the City of Phoenix permit filing, so a single order covers the job.

Source: Phoenix Commercial Building Permit Submittal Checklist

How long is the lead time on mezzanine options in Phoenix?

It changes with the design, the parts and the city's plan review, so we give it per job. Press "Check lead time" on any card and we answer with today's lead time for that option; your written quote then lists each step. Phoenix collects plan review fees at submittal and permit fees when the permit is issued.

Source: Phoenix Commercial Building Permit Submittal Checklist

Which option choices change the mezzanine permit in Phoenix?

Offices and enclosed rooms, sprinkler or alarm changes, and anything that adds load. Enclosed space falls under the openness rule in IBC 505.2.3, Phoenix issues a separate permit for fire sprinkler and alarm work (IBC 105.1 as amended), and decks over 50 psf need posted load signs (IBC 106.1). We settle the options before anything is filed.

Source: IBC 505.2.3, 105.1, 106.1 (2024 PBCC)

Can I add a gate or a lift to an existing mezzanine in Phoenix?

Usually, yes. Changing a structure counts as an alteration, and Phoenix asks for a permit before one starts (IBC 105.1), so we first check the deck's design load and edge framing. A gate at a pallet drop protects a hoist area under 29 CFR 1910.28(b)(2); a lift adds its own opening that gets the same treatment.

Source: IBC 105.1; 29 CFR 1910.21(b), 1910.28(b)(2)

10Request for quote

Request a Quote or a Lead Time

Give us the room, the height and the load you have in mind. A Valley installer answers with questions or a written price.

  1. 1You send the floor size, the clear height and the use.
  2. 2We test the plan against IBC 505 and the ADOSH rules.
  3. 3You receive a written quote that lists each step.

Prefer to talk? (928) 232-1752

Free-standing white steel mezzanine with yellow guardrail on four sides and one stair, seen from above

Build Up Inside Your Phoenix Building

  • Rated for what you store.
  • Drawn to the 2024 Phoenix code.
  • Installed around your schedule.
CallRequest a quote